Saturday, May 11, 2019
Construction suveyour to have done layout Essay Example | Topics and Well Written Essays - 500 words
Construction suveyour to have done layout - Essay ExampleThis kind of surveying is known as an as-built survey and is one of the five major elements of construction surveying (Irvine & Maclennan 145). The other major elements include checking conditions front to commencing a construction job for example, topography and existing infrastructure. The other aspect is to mark and create reference points followed by verification of the location of structures during construction.When the construction surveyor was designing the layout for a municipal street intersection in Murfreesboro area, he must have put all the factors into consideration. There was a wide range of factors that were taken into consideration, more or less were basic whereas others were quite complex in regards to the design and construction. First and foremost, he had to consider the type of highway to be constructed. In addition, the passageway allowances. These factors determine the amount of space to be allocated for the project and the general parameters in road construction. The surveyor had to consider the safety aspect of constructing the road where it is located rather than somewhere else. This is because in road construction, the topography is a factor of the essence to determine the design of the road as well as, the flow of outpouring (Irvine & Maclennan145).A nonher factor that may seem obvious is the availability of other infrastructure that is. the pre-existing infrastructure and the proximity to the road. Some things kindred electricity lines, water, and sewer lines may have affected substantially the surveyors decision to position the road as it is now in Murfreesboro. Simple as it may seem, things like the power lines affect profoundly the lighting of the road in that the proximity of the power lines do not determine the availability of the street lights.There are the less obvious considered factors and that still count in choosing the methodology of choosing the design. Thes e include the likes of expected traffic on the road. The amount of
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment